1 OAK · Cost guide · Los Angeles
What an ADU costs in Los Angeles, line by line.
Three things decide an ADU budget before a single finish is picked: which type you can build, how far the new structure sits from the utility meter, and whether a machine can reach the site. Below are the ranges we actually quote, with the site work broken out so you can see what each decision adds.
CSLB #1015424 · Licensed & insured · Same numbers we quote
What adu / jadu costs here
- Detached ADU, 600–1,000 sq ft
- $126,000 – $294,000
- Garage conversion
- $84,000 – $182,000
- Attached JADU
- $63,000 – $126,000
Full breakdown below
Every line, with what moves it.
Ranges assume a permit-ready project on a flat Los Angeles lot with reasonable access. We confirm yours at the walkthrough rather than quoting a best case.
Item
Typical range
What changes it
- Detached ADU, 600–1,000 sq ft
- $126,000 – $294,000
- Foundation, framing, roof, utilities and finishes. Distance from the meter and crane access push toward the top of the range.
- Garage conversion
- $84,000 – $182,000
- The slab, walls and roof already exist, so the money goes into insulation, windows, plumbing and a new kitchen and bath.
- Attached JADU
- $63,000 – $126,000
- Inside the existing footprint: one room, a compact bath and sometimes a kitchenette. The least expensive route on a tight lot.
- Utility trench to the main panel
- $8,000 – $26,000
- Water, sewer and power run from the house to the new structure. Whatever is in the way (deck, concrete, planting) comes out first.
- Electrical service upgrade
- $4,500 – $9,500
- Most 1940s and 1950s Valley houses do not carry a second dwelling on the existing 100-amp service.
- Plan check and permit fees
- $6,000 – $18,000
- LADBS fees scale with valuation. Hillside and HPOZ parcels add review time, not usually much fee.
- Backyard restoration
- $6,000 – $24,000
- Putting back the driveway, deck and planting the build disturbed. Priced only for what the site actually loses.
What actually moves the number.
Site access
A yard a machine can reach from the street is a different job from one dug by hand through a side gate. On tight Studio City and hillside parcels this is a real line in the estimate, not a rounding error.
Distance from the utilities
Every additional foot of trench for water, sewer and power costs money, and a sewer that has to be lifted needs a pump. Ask where the meter sits before you fall in love with a rear-corner location.
Type and size
A garage conversion reuses an existing shell; a detached ADU builds one. Decide the type against your lot first, then set the size, and the budget follows the plan instead of the other way round.
Finishes and systems
We quote a standard and an upgraded finish package. HVAC, insulation and glazing are where cheap ADUs fail inspection and comfort later, so those are never the lines we trim.
From first drawing to final inspection.
- 01
Feasibility and drawings
We read the parcel, confirm what the jurisdiction allows, and draw the set. Usually four to eight weeks.
- 02
Plan check
LADBS typically four to nine months for an ADU. We respond to the comments ourselves, so nothing waits on a third party.
- 03
Construction
Four to seven months on site for a detached ADU, three to five for a garage conversion, depending on weather and inspections.
Answers
ADU / JADU cost: the questions we get first.
Straight answers, with the same numbers we quote in the estimate.
What is the cheapest way to add an ADU in Los Angeles?
A garage conversion or an attached JADU. Both reuse an existing shell or footprint, which is why they start at $84,000 and $63,000 against $126,000 for a detached build. The trade-off is size and how much of the yard you keep.
Does the ADU price include permits and design?
No. Design, structural engineering, plan check fees and school fees sit outside the construction range, and on a detached ADU they typically add 10 to 15 percent. We list them as separate lines in the first estimate so the total is honest.
How much does an ADU rent for in Los Angeles?
We are a builder, not a broker, so we do not quote rents. What we do is price the build so the number is defensible: a one-bedroom detached ADU costs a fraction of the same square footage inside a new house.
Can I build an ADU and stay in the house while it goes up?
Yes, and most of our clients do. A detached ADU is a separate structure with its own access; a garage conversion is harder because the work is in the yard. We phase the job and agree which gate stays usable.
Free itemised estimate for your property.
Bring a photo or a plat map. We read the parcel, tell you what your city allows, and price the work line by line.
Get free estimate