1 OAK · Bathroom

Bathrooms that feel twice the size.

Wet rooms, walk-in showers and quiet stone. Not every one stays inside the same four walls: where it earns the space, we bump out instead of in, add a window, and take back the closet. Drag the handle on any photo below to compare.

  • Primary suite
  • Guest bath
  • Wet room
Sherman Oaks · primary bath afterBeforeAfter

Sherman Oaks · primary bath

The same room, re-tiled and refitted with a floating oak vanity, a glass walk-in shower and a tub. Instead of a bump in, the closet was demolished and a bump out built in its place to bring in a new window, so the tub now sits under real daylight.

Drag the handle to compare the same property.

1 OAK · Bathroom

Bathroom remodeling in Los Angeles, including the ones that gain space.

Licensed general contractor serving Sherman Oaks, West Hollywood, Santa Monica and the rest of Los Angeles County. Estimates are free and itemised.

  • Sherman Oaks
  • West Hollywood
  • Santa Monica
  • Pasadena
  • Burbank
  • Silver Lake
  • Long Beach
  • Culver City

What a bathroom remodel costs

A hall bath rebuilt in place runs $20,000 to $42,000. A primary bath with a wet room, a double vanity and a curbless shower runs $45,000 to $98,000. Taking space from a closet or bumping out an exterior wall adds $18,000 to $42,000 on top, but it is often the only way a 5 by 8 foot bathroom stops feeling like one. Waterproofing, drainage slope and venting are where cheap bathrooms fail, so those are never the lines we trim.

Waterproofing is the whole job

Every shower we build gets a sloped mud bed, a bonded waterproof membrane and a flood test before tile goes down. That is the difference between a bathroom that lasts twenty years and one that grows mould behind the tile in three. We keep the inspection card on site and photograph the membrane before it is covered, so you own the record of what is inside the wall.

Three weeks to six, depending on scope

A hall bath takes three to five weeks. A primary suite with moved plumbing takes five to eight. Tile and stone lead times drive most of that, so we order early and hold the schedule around the material rather than the other way round. If the house has only one bathroom, we plan the work so you are never without a working toilet and shower for more than a day at a time.

More Bathroom work

The same property, before and after.

Every project
Reseda · primary bath afterBeforeAfter

Reseda · primary bath

The same builder bath, same footprint: the garden tub set into a stone-decked alcove beside a solid tiled divider, a glass-front shower in the old stall, and one long floating vanity under the same wide window.

Los Angeles · marble primary bath afterBeforeAfter

Los Angeles · marble primary bath

The same room from the same corner, stripped to the studs and finished in book-matched marble with heavy gold veining: a freestanding tub under the original corner window, a walk-in shower on a dark stone platform with a floating oak bench, and a black tiered light above the tub. The master and kids baths were also resolved in three dimensions long before a tile was cut — every fixture, tile run, niche and light placed and checked on screen first.

Los Angeles · modern bath remodel · photo 1

Los Angeles · modern bath remodel

A dated bath rebuilt in a navy, marble and matte black palette: a floating navy vanity with an open shelf under a white marble top and rectangular undermount sink, a pivot mirror under a three-light Edison fixture, white hexagon tile with scattered black hex accents, a half-glass tub and shower on stacked white subway tile with a recessed niche, and a plantation shutter over the window.

Los Angeles · brass walk-in shower bath · photo 1

Los Angeles · brass walk-in shower bath

A hall bath rebuilt around a frameless glass walk-in shower: brushed brass hinges, handle, rainfall head and handheld on a slide bar, a tiled bench inside, two recessed niches and the shower floor inlaid in the same patterned tile, white subway tile on the walls, and white hexagon tile across the bathroom floor.

Los Angeles · ADA bathroom · photo 1

Los Angeles · ADA bathroom

A full accessible bathroom: curbless roll-in wet room with a linear drain, white subway tile and chrome grab bars, a console sink, a niche under the frosted window and clear floor space throughout.

West Los Angeles · tenant improvement for two apartment units afterBeforeAfter

West Los Angeles · tenant improvement for two apartment units

Two dated apartment units brought up to one modern standard. Each galley kitchen was rebuilt with grey shaker cabinets, white quartz counters with a waterfall end, a white subway-tile backsplash in dark grout, matte black pulls and faucets, and stainless appliances over wide-plank wood flooring. The baths got the same language — a floor-to-ceiling subway surround with a black-framed niche and window, a wood vanity and matte black fixtures — and the living areas were repainted, refloored and fitted with ductless mini-splits, so both units could be rented the same week.

Answers

Bathroom questions, answered.

The cost, the permit clock and the scope, at the numbers we actually quote in Los Angeles.

How much does a bathroom remodel cost?

A hall bath rebuilt in place runs $20,000 to $42,000. A primary bath with a wet room, a double vanity and a curbless shower runs $45,000 to $98,000, and taking space from a closet or bumping out a wall adds $18,000 to $42,000.

How do you waterproof a shower?

Every shower gets a sloped mud bed, a bonded waterproof membrane and a flood test before tile goes down. We photograph the membrane before it is covered, so you own the record of what is inside the wall.

How long will I be without a bathroom?

A hall bath takes three to five weeks and a primary suite five to eight. If the house has only one bathroom, we plan the work so you are never without a working toilet and shower for more than a day at a time.

Can you enlarge a small bathroom?

Often yes, by taking space from an adjacent closet or bumping an exterior wall. It is frequently the only way a 5 by 8 foot bathroom stops feeling like one, and we price it as its own line so you can decide.

Next step

Tell us about your bathroom and we will price it.

A free site visit, a line-item estimate and a build schedule. No obligation, no design fee.