1 OAK · Cost guide · Los Angeles
What a home addition costs in Los Angeles.
An addition is priced by the square foot because that is how the structure grows, but the range inside each square foot is wide: tying a new room into an existing house costs more per foot than building the same room on a bare lot. These are the numbers we quote, with the tie-in work separate.
CSLB #1015424 · Licensed & insured · Same numbers we quote
What addition costs here
- Rear extension or side wing
- $210 – $350 / sq ft
- 500 sq ft addition, all in
- $105,000 – $175,000
- Second story
- $245 – $385 / sq ft
Full breakdown below
Every line, with what moves it.
Ranges assume a permit-ready project on a flat Los Angeles lot with reasonable access. We confirm yours at the walkthrough rather than quoting a best case.
Item
Typical range
What changes it
- Rear extension or side wing
- $210 – $350 / sq ft
- Foundation, framing, roof, insulation, finishes and extending the systems. Hillside grade and long utility runs sit at the top.
- 500 sq ft addition, all in
- $105,000 – $175,000
- The typical one-room addition. The price covers the structure and finishes, not furniture or the pool it displaces.
- Second story
- $245 – $385 / sq ft
- Higher per foot because the existing foundation and framing usually need strengthening and the roof comes off first.
- Structural tie-in and foundation
- $18,000 – $65,000
- New footings, a shear connection to the existing house and any beam or post the opening needs.
- Roof tie-in and reroof
- $9,000 – $28,000
- Matching the existing pitch and material. The old roof often has to come up where the two planes meet.
- Plumbing, electrical and HVAC extension
- $14,000 – $40,000
- Pushing services into new square footage, and often upgrading the panel to carry it.
- Plan check and permit fees
- $5,000 – $16,000
- Scales with added valuation. Three to six months of plan check is typical, longer where design review applies.
What actually moves the number.
How the new room meets the old house
Every addition starts where the existing structure ends, and that seam drives foundation, framing and roof cost. Opening a load-bearing wall for an open plan means a stamped beam and a shoring plan, which is usually the single largest line.
Second story versus going out
Going up costs more per square foot than going out, but it keeps your yard. On a large Encino lot the rear extension usually wins; on a tight Studio City parcel the second story is often the only way to add bedrooms.
Site access
Excavation, concrete and framing material all have to reach the back of the lot. A narrow driveway or a canyon parcel means carrying material in by hand or conveyor, and that is priced upfront.
What the existing house needs
Older houses frequently need a panel upgrade, a new water main or foundation work before they can carry an addition. We open small inspection areas before quoting so those lines are priced, not negotiated mid-job.
From first drawing to final inspection.
- 01
Walkthrough and drawings
We measure the house, check the foundation and the service panel, and draw the addition. Three to six weeks.
- 02
Plan check
LADBS approval typically three to six months. Structural and energy calculations go in with the first submission to avoid a second cycle.
- 03
Construction
Five to nine months on site for a single-room addition, longer for a second story, with inspections held by the same team that builds.
Answers
Addition cost: the questions we get first.
Straight answers, with the same numbers we quote in the estimate.
How much does it cost to add 500 square feet in Los Angeles?
Roughly $105,000 to $175,000 at $210 to $350 per square foot. The low end assumes a flat lot, straightforward access and finishes that match the existing house; the high end covers a slope, a long utility run or new systems.
Is a second story cheaper than a ground-floor addition?
No, it costs more per square foot at $245 to $385 against $210 to $350, because the foundation and framing below usually need strengthening and the roof comes off. It is still often the right answer when the lot cannot grow.
How long does an addition take start to finish?
Plan for a year: three to six weeks of drawings, three to six months of plan check and five to nine months of construction. We give you those three phases as separate dates rather than one optimistic finish date.
Do I need an architect?
Not separately. We draw and engineer the set in house, which is why the drawings, the structural calculations and the construction all sit under one contract and one point of responsibility.
Free itemised estimate for your property.
Bring a photo or a plat map. We read the parcel, tell you what your city allows, and price the work line by line.
Get free estimate