1 OAK · Roofing

Roofs that end the leaks and the patch jobs.

Standing-seam metal, tile and shingle systems installed with new fascia, gutters and ventilation. Drag to compare the same house.

  • Standing-seam metal
  • Tile & shingle
  • Fascia & gutters
Reseda · new roof system afterBeforeAfter

Reseda · new roof system

The same house, re-roofed in charcoal standing-seam metal with new fascia and gutters — worn shingles gone for good.

Drag the handle to compare the same property.

1 OAK · Roofing

Roof replacement in Los Angeles, without the patch jobs.

Licensed general contractor serving Sherman Oaks, Pasadena, Glendale and the rest of Los Angeles County. Estimates are free and itemised.

  • Sherman Oaks
  • Pasadena
  • Glendale
  • Burbank
  • Santa Monica
  • Long Beach
  • Torrance
  • Woodland Hills

What a new roof costs

Most Los Angeles roof replacements land between $13,000 and $38,000 for a typical single-family house. Composition shingle is the least expensive system; concrete tile and standing-seam metal run higher, and metal also needs its own substrate and a different panel layout. The number is driven by square footage, pitch, how many layers have to be torn off, and whether the fascia and sheathing are still sound underneath. A repair quote and a replacement quote are genuinely different jobs, and we tell you which one your roof needs.

Tear-off, sheathing and ventilation

We tear off to the deck rather than roofing over an old layer, because the second layer hides the sheathing and traps heat. Ventilation is rebuilt at the same time: intake at the eaves, exhaust at the ridge, sized to the roof area. A roof that is correctly ventilated keeps the attic cooler, lasts longer and stops the condensation that shows up as stains on the ceiling below. Inspection happens before the finished surface goes on.

Two to five days on the roof

A straightforward tear-off and reroof takes two to five working days, weather permitting. The roof is dried in each evening so the house is never open overnight. Gutters, downspouts and fascia are replaced while the crew is already up there, which is far cheaper than coming back for them later. Tile roofs take longer because the existing tile has to be lifted, counted and reused or replaced.

More Roofing work

The same property, before and after.

Every project
Santa Monica · exterior restoration afterBeforeAfter

Santa Monica · exterior restoration

A complete exterior restoration: a new roof system, all new black-framed windows and garage doors, the weathered siding and scalloped gable trim repaired, and the whole house repainted in soft gray with crisp white trim on the original architecture.

Sherman Oaks · full remodel afterBeforeAfter

Sherman Oaks · full remodel

The same 1950s ranch, reimagined on the same footprint: new roof line, steel windows, cedar entry and native landscape.

Answers

Roofing questions, answered.

The cost, the permit clock and the scope, at the numbers we actually quote in Los Angeles.

What does a new roof cost in Los Angeles?

Most roof replacements land between $13,000 and $38,000 for a typical single-family house. Square footage, pitch, how many layers must come off, and the state of the sheathing drive the number.

Do you roof over the old shingles?

No. We tear off to the deck, because a second layer hides the sheathing and traps heat. Ventilation is rebuilt at the same time: intake at the eaves, exhaust at the ridge, sized to the roof area.

How long will my roof take?

A tear-off and reroof takes two to five working days, weather permitting, and the roof is dried in each evening so the house is never open overnight. Tile roofs take longer because the tile is lifted and reused or replaced.

Do I need a repair or a replacement?

They are genuinely different jobs, and we tell you which one your roof needs. Gutters, downspouts and fascia are cheapest to replace while the crew is already up there.

Next step

Tell us about your roofing and we will price it.

A free site visit, a line-item estimate and a build schedule. No obligation, no design fee.